Driveways, foundations, retaining walls, and block work for homeowners and general contractors across Fannin County. Two crews, our own pump truck, and finish work clean enough to leave unstamped - though we stamp it anyway.

KESSLER CONC.
EST 1998
BONHAM TX
 3,000–5,000 PSI MIX DESIGNS · #4 REBAR ON 18" CENTERS · SAME-WEEK BIDS · CITY INSPECTION READY · 3,000–5,000 PSI MIX DESIGNS · #4 REBAR ON 18" CENTERS · SAME-WEEK BIDS · CITY INSPECTION READY · 
FLATWORK - 4" / 3,500 PSI

Driveways & Patios

Broom, smooth, or exposed-aggregate finishes with proper base compaction and control joints laid out on a plan, not by eye.

CURE TIME: 7 DAYS TO DRIVE
STRUCTURAL - ENGINEERED

Foundations & Slabs

New foundations, additions, and garage slabs built to your engineer's specs, with inspections scheduled and passed on the first visit.

DEPUTY INSPECTION FRIENDLY
RETAINING - CMU / POURED

Retaining Walls

Block and cast-in-place walls with real drainage behind them: gravel, filter fabric, and weeps. Walls fail from water, not weight.

UP TO 12 FT ENGINEERED
MASONRY - BRICK / STONE

Block & Veneer

Fence walls, planters, and veneer work with tight joints and matched mortar color. Repairs blended so you can't find the patch.

COLOR-MATCHED MORTAR
DEMO - PERMITTED

Removal & Haul-Off

Sawcut, break, and haul with dust control. We recycle the rubble as base material whenever the next pour allows it.

RUBBLE RECYCLED ~90%
FINISH - DECORATIVE

Stamped & Stained

Stamped patterns, integral color, and acid stains that hold up to sun and sprinklers. Samples poured on site before you choose.

ON-SITE SAMPLE SLABS

From bid to broom finish.

STEP 01

Site Visit

Measure, check grade and access, talk through what the slab needs to carry.

STEP 02

Fixed Bid

Line-item bid within the week. The number on the page is the number you pay.

STEP 03

Form & Pour

Base, steel, forms, inspection, pour. Most residential jobs form-to-finish in 2–5 days.

STEP 04

Cure & Clean

Cure compound down, site swept, cut sheet of do's and don'ts for the first 28 days.